Futuristic Total Quality Visualization
Next Generation Quality Management

Total Quality Excellence

Transform your quality management with AI-powered insights, real-time analytics, and predictive quality control systems.

Get Started
98% Quality Rate
24/7 Monitoring
100% Compliance

Quality Management Services

Choose your quality management focus area

System Quality

Implement and maintain quality management systems that align with international standards.

ISO Compliance
98.5%
Audit Score
4.8/5
Explore System Quality

Project Quality

Manage project quality assurance and control processes.

On-Time Delivery
92%
Quality Goals Met
87%
Explore Project Quality

Product Quality

Comprehensive product quality management including FMEA analysis, testing, and continuous improvement.

First Pass Yield
95.2%
Defect Rate
0.8%

Process Quality

Optimize manufacturing processes with statistical process control and lean methods.

Process Efficiency
94.3%
Cycle Time
-15%

Quality Performance Overview

Track and monitor key quality metrics across all areas

98.5%

Quality Rate

Overall quality performance across all processes

100%

Compliance Rate

Regulatory and standard compliance achievement

-15%

Quality Costs

Reduction in quality-related costs

96%

Customer Satisfaction

Overall customer satisfaction score

Dashboard | FMEA Management System
logo
|

FMEA Management System

JD

John Doe

Quality Engineer

Dashboard

FMEA Projects Dashboard

Welcome back, John. Here's an overview of your FMEA projects.

Total Projects

24

Active projects

12%

Completion Rate

68%

Average rate

5%

High Risk Items

37

Across all projects

8%

Team Members

18

Active contributors

2

Active FMEA Projects

Brake System FMEA

Master Cylinder Assembly

In Progress
Risk Priority
High
Issues
12
Reviews
8/10
Progress 85%
JD
AJ
DT
+2
Due: Jul 10, 2025
FMEA-BRK-2025-073
Continue

Fuel System FMEA

Fuel Pump Assembly

Completed
Risk Priority
Medium
Issues
8
Reviews
10/10
Progress 100%
JD
SW
MR
Completed: Jun 28, 2025
FMEA-FUEL-2025-062
View Report

HVAC System FMEA

Climate Control Module

In Progress
Progress 42%
DT
AJ
+1
Due: Aug 15, 2025
FMEA-HVAC-2025-081
Continue

Steering System FMEA

Power Steering Unit

On Hold
Progress 28%
JD
MR
Paused: Jul 2, 2025
FMEA-STR-2025-079
Resume

Electrical System FMEA

Battery Management

Draft
Progress 15%
SW
JD
+3
Due: Sep 5, 2025
FMEA-ELEC-2025-092
Continue

Transmission FMEA

Automatic Transmission

Review
Progress 92%
DT
AJ
MR
Due: Jul 15, 2025
FMEA-TRANS-2025-075
Review

Recent Activities

You updated the Brake System FMEA document

2 hours ago

Updated document information and completed approval workflow setup.

FMEA-BRK-2025-073 View Changes

Richard Brown approved the Brake System FMEA document

4 hours ago

Approved with minor comments on risk mitigation.

FMEA-BRK-2025-073 View Document

Amanda Johnson added you to Electrical System FMEA team

Yesterday

You have been assigned as a Quality Engineer on this project.

FMEA-ELEC-2025-092 View Project

High risk item identified in Transmission FMEA

2 days ago

New high risk failure mode identified for torque converter assembly.

FMEA-TRANS-2025-075 View Details

Deadline approaching for HVAC System FMEA

3 days ago

The project is due in 6 weeks and is currently at 42% completion.

FMEA-HVAC-2025-081 View Timeline

Upcoming Deadlines

Brake System FMEA

Due in 6 days (Jul 10)

Transmission FMEA

Due in 11 days (Jul 15)

HVAC System FMEA

Due in 42 days (Aug 15)

Electrical System FMEA

Due in 63 days (Sep 5)

Team Assignments

JD

John Doe

Quality Engineer

5 Projects

High Load
AJ

Amanda Johnson

Design Engineer

3 Projects

Medium Load
DT

David Thompson

Manufacturing Engineer

3 Projects

Medium Load
SW

Sarah Wilson

Test Engineer

2 Projects

Low Load
MR

Michael Rodriguez

Safety Engineer

3 Projects

Medium Load

Project Completion Rate

Notifications

Document Approval Required

Brake System FMEA document requires your approval.

2 hours ago

High Risk Item Added

New high risk failure mode identified in Transmission FMEA.

Yesterday

Project Completed

Fuel System FMEA has been completed successfully.

2 days ago

New Team Member

Robert Chen has joined the FMEA Management System.

3 days ago