Welcome to Total Quality Management

Manage your quality systems, projects, products, and processes from one central dashboard.

24

Total Projects

Active quality projects

+12% from last month
68%

Completion Rate

Average project completion

+5% improvement
37

High Risk Items

Across all projects

-8% reduction
18

Team Members

Active contributors

+2 new members

Quality Management Modules

System Quality

Implement and maintain quality management systems that align with international standards.

ISO Compliance
98.5%
Audit Score
4.8/5
Access System Quality

Project Quality

Manage project quality assurance and control processes with comprehensive tracking.

On-Time Delivery
92%
Quality Goals Met
87%
Access Project Quality

Product Quality

Comprehensive product quality management including FMEA analysis, testing, and continuous improvement.

First Pass Yield
95.2%
Defect Rate
0.8%
Access Product Quality

Process Quality

Optimize manufacturing processes with statistical process control and lean methods.

Process Efficiency
94.3%
Cycle Time
-15%
Access Process Quality

Recent Project Activity

Brake System FMEA document updated

2 hours ago

Updated risk assessment and mitigation strategies for master cylinder assembly.

FMEA-BRK-2025-073 View Changes

Fuel System FMEA project completed

4 hours ago

All risk assessments completed and approved by quality team.

FMEA-FUEL-2025-062 View Report

New team member added to HVAC project

Yesterday

Sarah Wilson joined as Test Engineer for climate control module analysis.

FMEA-HVAC-2025-081 View Team

High risk item identified in Transmission FMEA

2 days ago

Critical failure mode detected in torque converter assembly requiring immediate attention.

FMEA-TRANS-2025-075 View Details

Upcoming Deadlines

Brake System FMEA

Due in 6 days (Jul 10)

Transmission FMEA

Due in 11 days (Jul 15)

HVAC System FMEA

Due in 42 days (Aug 15)

Team Assignments

JD

John Doe

Quality Engineer

5 Projects

High Load
AJ

Amanda Johnson

Design Engineer

3 Projects

Medium Load
DT

David Thompson

Manufacturing Engineer

3 Projects

Medium Load
SW

Sarah Wilson

Test Engineer

2 Projects

Low Load

Project Completion Rate

Notifications

Document Approval Required

Brake System FMEA document requires your approval.

2 hours ago

High Risk Item Added

New high risk failure mode identified in Transmission FMEA.

Yesterday

Project Completed

Fuel System FMEA has been completed successfully.

2 days ago