logo
|

System Quality Management

JD

John Doe

Quality Manager

Compliance Status Overview

IATF 16949
ISO 9100
92%

IATF 16949 Compliance

Automotive Quality

96%

ISO 9100 Compliance

Aerospace Quality

Next Audit

Aug 15, 2025

In 42 days

Critical Actions

3 items require

immediate attention

IATF 16949 Core Tools

Active

APQP Tracker

Advanced Product Quality Planning status and milestones

Phase 3 Progress 78%
Pending

PPAP Status

Production Part Approval Process tracking

Approved Parts 24/30
Pending Review 6
Monitoring

SPC Charts

Statistical Process Control monitoring

In Control 18/20
Out of Control 2
Updated

FMEA Analysis

Failure Mode and Effects Analysis

High Risk Items 5
Medium Risk 12
Validated

MSA Results

Measurement System Analysis

Gage R&R 15.2%
Bias Study Acceptable
Active

Control Plans

Process control plan management

Active Plans 28
Pending Review 3

ISO 9100 Aerospace Quality Controls

FOD Prevention

Foreign Object Damage controls

Zero Incidents

Special Processes

Critical process controls

12 Active

Configuration Mgmt

Product configuration control

Current

First Article

Inspection reports

3 Pending

Document Control Center

Quality Manual

Rev 3.2 - Current

Approved

Standard Operating Procedures

125 documents

5 Pending

Process Flow Diagrams

42 processes mapped

Current

Calibration Records

Next due: Jul 28, 2025

Scheduled

Risk Management

Supply Chain Disruption

High Risk

Critical supplier capacity constraints affecting delivery schedule

Mitigation: 60% complete

Equipment Obsolescence

Medium Risk

Legacy equipment requiring replacement within 18 months

Mitigation: 35% complete

Process Optimization

Opportunity

Lean manufacturing implementation potential identified

Implementation: 80% complete

Regulatory Changes

Low Risk

Upcoming standard revisions requiring documentation updates

Preparation: 90% complete

Process Performance Metrics

1.67
Process Capability (Cpk)
Above target (1.33)
94.2%
Overall Equipment Effectiveness
+2.1% vs last month
2.3%
Scrap & Rework Rate
Target: <2.0%
98.7%
On-Time Delivery
Above target (95%)

Audit Management

Internal Audit - Q3

Scheduled

ISO 9001 compliance review

Aug 15-17, 2025

IATF Surveillance

In Progress

Annual surveillance audit

Jul 20-22, 2025

Customer Audit

Completed

Boeing supplier assessment

Jun 28, 2025

Corrective Actions

3 Open

Follow-up required

Due: Aug 1, 2025

Audit Findings Summary

Major Non-conformities 0
Minor Non-conformities 3
Observations 7
Opportunities 12

Training & Competency

JD

John Doe

Quality Manager

95% Complete
ISO 9001 Lead Auditor
AJ

Amanda Johnson

Design Engineer

60% Complete
IATF 16949 Training
DT

David Thompson

Manufacturing Engineer

Overdue
SPC Refresher

Upcoming Training Schedule

ISO 9100 Overview Jul 25, 2025
Root Cause Analysis Aug 2, 2025
Internal Auditor Aug 10, 2025

Action Center

8 Items

Pending Approvals

3

Quality manual revisions awaiting approval

Document Reviews

5

SOPs scheduled for periodic review

Non-conformance Reports

2

New NCRs requiring investigation

Customer Complaints

1

Quality concern from Airbus

Supplier Issues

0

All supplier issues resolved