Dashboard / FMEA Projects / Planning & Preparation / Structure Analysis / Function Analysis / Failure Analysis / Risk Analysis / Optimization

AIAG-VDA FMEA Process

Optimization

Step 6 of 7 - AIAG-VDA FMEA

Action Plan Development

Develop action plans to address high-risk failure modes identified in the Risk Analysis step.

Failure Mode Component
Current RPN
Recommended Actions Responsibility Target Date Status Actions
External fluid leakage Master Cylinder
240
  • Implement redundant sealing system
  • Enhance material specifications
RM
Robert Miller
2025-08-15 In Progress
Brake line rupture Brake Lines
250
  • Upgrade to braided stainless steel lines
  • Add protective shielding in vulnerable areas
AJ
Amanda Johnson
2025-09-01 Completed
Insufficient pressure generation Master Cylinder
180
  • Redesign cylinder bore geometry
  • Implement improved piston seal material
DT
David Thompson
2025-08-30 Planning
Showing 3 of 3 high-risk failure modes
1

Action Implementation Status

Track the implementation progress of recommended actions.

Planning

1

In Progress

1

Completed

1

Overall Progress

33% Complete

Upcoming Deadlines

External fluid leakage

Due in 42 days

2025-08-15

Insufficient pressure generation

Due in 57 days

2025-08-30

Assignee Workload

RM
Robert Miller
1 Action
AJ
Amanda Johnson
1 Action
DT
David Thompson
1 Action

Risk Reduction Analysis

Analyze the effectiveness of implemented actions in reducing risk.

RPN Reduction

Risk Level Distribution

Action Effectiveness Evaluation

Evaluate the effectiveness of implemented actions in addressing failure modes.

Failure Mode Action Taken
Before RPN
After RPN
Reduction %
Effectiveness Validation Method
Brake line rupture

Upgraded to braided stainless steel lines

250
60
76%
8
High
Pressure testing, Vibration testing

Validation Results:

Pressure tests showed 4x improvement in burst resistance. Vibration testing confirmed no failures after 500 hours of simulated road conditions. Corrosion resistance improved by 85% in salt spray testing.

External fluid leakage

Implemented redundant sealing system (In Progress)

240
--
--
--
Pending
Planned: Leak detection, Pressure cycling
Insufficient pressure generation

Redesign cylinder bore geometry (Planning)

180
--
--
--
Pending
Planned: Pressure output testing, Durability testing

Optimization Guide

Optimization is Step 6 of the AIAG-VDA FMEA process. This step focuses on developing and implementing actions to reduce risk for high-priority failure modes identified in the Risk Analysis step.

  • Develop specific actions for high-risk failure modes
  • Assign responsibility and target completion dates
  • Track implementation status
  • Evaluate effectiveness of actions

Action Development

External fluid leakage (Master Cylinder)
240
7
Low Medium High

Expected Risk Reduction

Before RPN
240
Expected After RPN
48
Reduction
80%

Action Plan Templates

Design Improvement Template

For actions requiring design changes to address failure modes

Process Control Template

For actions focused on manufacturing process improvements

Detection Enhancement Template

For actions aimed at improving detection capabilities